Prozanta Template
PDCA cycle
Plan — Do — Check — Act
Project:
Owner:
Date:
How to use this template
PDCA — Plan, Do, Check, Act — is a structured improvement cycle: you test a change on a small scale, measure the effect and only standardise what works. The cycle was popularised by W. Edwards Deming and is the backbone of data-driven improvement.
When do you use it?
When you want to test an improvement before rolling it out — e.g. a new routine, a process change or a solution from a 5 Why/A3. Best when the effect is uncertain.
Time & rhythm
A cycle typically runs over 1-4 weeks. Keep it short — the point is to learn fast, not to plan perfectly.
Step by step
- Plan: Define the problem, a measurable goal and a hypothesis.
- Do: Test on a small scale and note what actually happens.
- Check: Measure the result against the goal — with numbers, not gut feeling.
- Act: Standardise if it worked; adjust and run a new cycle if not.
- Repeat — improvement is a series of cycles, not one project.
Watch out
- Don't skip Check — without measurement you don't know whether the change worked.
- Test small first; a full rollout without a test is guesswork.
- "Act" also means discarding what didn't work — that is a valid result.
Example
- Plan: reduce changeover time from 50 to 30 min via a new sequence
- Do: test on one machine for a week
- Check: actually 34 min
- Act: standardise the sequence and run a new cycle toward 30
Method: W. Edwards Deming, “Out of the Crisis” (1986); builds on Walter Shewhart.
Read: Why Lean implementations fail →P
PLAN
Define the problem and solution hypothesis
D
DO
Test and implement on a small scale
C
CHECK
Measure results and compare with the goal
A
ACT
Standardise or adjust and repeat
PLAN — Planning
Problem statement (what, where, when)
Current state / KPI baseline
Proposed solution / hypothesis
Target result (specific and measurable)
Resources / who is involved
Timeline for the test
DO — Implementation
Test scope (what, where, who)
Steps / actions implemented
Observations along the way
Unexpected events
CHECK — Evaluation
KPI — Before
KPI — After
Improvement %
What worked?
What didn't work?
Did we hit the target result?
ACT — Next step
Learnings from this cycle
Standardisation (what should be documented?)
Next step
Prozanta · prozanta.dk
PDCA cycle template
Approved: