Kanban board

Visual flow management with WIP limits, blockers and lead time

Team / Dept:

Week:

Sprint / Period:

How to use this template

Kanban is a visual flow-management system: tasks move physically (or digitally) from left to right, and WIP limits (Work In Progress limits) prevent build-up. Kanban comes from Toyota and is about making flow visible, identifying blockers and pulling forward instead of pushing from behind.

WIP limit

Max number of tasks in one column. Exceeding it stops new starts — solve the blocker instead. Start with WIP = number of team members + 1.

Pull principle

Tasks are pulled forward by the next person when they have capacity — never pushed by the previous one. Respect the WIP limit unconditionally.

Lead time

From a task starting ("In progress") to it being delivered ("Done"). Measure weekly and show the trend — falling lead time = better flow.

Step by step — the first time

  1. Define your columns based on the actual work sequence — not ideal phases.
  2. Set WIP limits: start with number of team members × 1.5 and adjust from experience.
  3. Write all in-progress tasks on cards and place them in the correct column.
  4. Hold a 15-minute stand-up at the board every day — move cards, identify blockers.
  5. Treat blockers as critical: the whole team helps remove them before new tasks start.
  6. Measure lead time and WIP breaches weekly and discuss trends in the team meeting.

Watch out

  • WIP limits that are never exceeded are a sign of limits set too high — they don't really constrain.
  • Kanban makes problems visible; it doesn't solve them. Blockers require active action.
  • Avoid having tasks in "In progress" that haven't been actively worked on for the last 2 days — it hides the real WIP.

Example

A team of 4. WIP limit on "In progress": 3 tasks. A 5th person tries to start task 4 — instead they help a colleague finish an existing task first. Lead time: 3 days (average, week 12).

Method: Taiichi Ohno / Toyota Production System; further developed by David J. Anderson, “Kanban: Successful Evolutionary Change” (2010).

Kanban board

Backlog

Not started

Task:

Owner:

Start date:

Task:

Owner:

Start date:

Task:

Owner:

Start date:

Task:

Owner:

Start date:

Task:

Owner:

Start date:

Task:

Owner:

Start date:

Ready to start

Prioritised and ready

WIP max: ___

Task:

Owner:

Start date:

Task:

Owner:

Start date:

Task:

Owner:

Start date:

Task:

Owner:

Start date:

Task:

Owner:

Start date:

Task:

Owner:

Start date:

In progress

Actively being worked

WIP max: ___

Task:

Owner:

Start date:

Task:

Owner:

Start date:

Task:

Owner:

Start date:

Task:

Owner:

Start date:

Task:

Owner:

Start date:

Task:

Owner:

Start date:

Review / Check

Awaiting approval

WIP max: ___

Task:

Owner:

Start date:

Task:

Owner:

Start date:

Task:

Owner:

Start date:

Task:

Owner:

Start date:

Task:

Owner:

Start date:

Task:

Owner:

Start date:

Done

Delivered and closed

Task:

Owner:

Start date:

Task:

Owner:

Start date:

Task:

Owner:

Start date:

Task:

Owner:

Start date:

Task:

Owner:

Start date:

Task:

Owner:

Start date:

Blockers — solve before the next iteration

Blocked taskReason for the blockWho solves itDeadlineStatus
□ Open □ Solved
□ Open □ Solved
□ Open □ Solved
□ Open □ Solved

Lead time (avg)

days

Completed (week)

tasks

WIP breaches

times

Blockers (week)

Prozanta · prozanta.dk

Kanban board

Week: · Team: